1992 Bombardier Challenger 601-3A

  • The Aircraft is maintained by MNG Jet and kept in hangar at all the times since 2002.

$

Ask For Pricing

AIRFRAME

(As of 01 July 2017)
Total Hours: 8.717 hours
Total Cycles: 5.236 cycles
Maintenance: Performed by Jet Aviation, MNG Jet
Program: CAMP system

ENGINES

Manufacturer: General Electric

Position Model Serial Number TSN CSN LLP Rem TSO/CSO OH Date
No.1 CF34-3A2 12931 8189 4940 1006 Cyc 2502/ 1375 06 Aug 04 GE
No.2 CF34-3A2 350470 8592 5221 779 Cyc 2625/ 1451 12 Aug 04 GE

APU

Manufacturer: Honeywell
Model: GTCP36-100E
Serial No: P-129C
Total APU Hours: 5203
Installation Date: 21 May 2005

INTERIOR

9 passenger seats in VIP configuration. 6 club seat and 3 seats Divan.
1 forward galley
1 aft lavatory
Carpet and divan leather change performed in Jan 2014.
It has always been kept in the hangar.
The Aircraft has no accident or incident. It’ll be delivered with an Export Certificate of Airworthiness.

INSPECTION

* The Aircraft is maintained by MNG Jet and kept in hangar at all the times since 2002.
12 Months Inspection
Last Done: 27 June 2017
Due: 27 June 2018

24 Months Inspection
Last Done: 27 June 2017
Due: 27 June 2019

36 Months Inspection
Last Done: 27 June 2017
Due: 27 June 2020

48 Months Inspection
Last Done: 28 May 2014
Due: 28 May 2018

60 Months Inspection
Last Done: 27 June 2017
Due: 27 June 2022

120 Months Inspection
Last Done: 23 August 2011
Due: 23 August 2021